75/20 Tonne Power Station Crane for GEC

Crane Specification:   Technical Resume:
 
Capacity
Span
Duty
Hoist Speed
Auxiliary Speed
Cross Traverse Speed
Long Travel Speed
Mode of Control   
 75/20 tonnes
 29.74 metres
M3/M4
 2.4/0.4 mpm
 6.4/0.7 mpm
 16 mpm (Inverter controlled)
 32 mpm (Inverter controlled)
Open Cabin & Standby Pendant
Two, 5-500 series cranes were supplied for the Sual Offshore contract. Tandem operation between the two cranes was achieved by a mechanical and electrical link and controlled from the 'master' pendant. The crane was supplied with a 130 tonne lifting beam for tandem lifting. Special features included battery lubrication system for the long and cross travel, access lights along the main walkway and trolley restraints in the event of possible seismic event.

 